Baseline Monitoring Reports – These reports present
the methodology and results of the air and noise measurements
taken during the baseline monitoring period. The results (i.e.
the baseline levels) will be used as the basis for impact
and compliance monitoring during construction; |
| |
Monthly EM&A Reports – A collation of the results
and findings of all EM&A work for each alignment (Ma On
Shan Rail (MOS), Tsim Sha Tsui Extension (TST) and Lok Ma
Chau Spurline (LMC)) for the past month; |
| |
Other
Lok Ma Chau Spurline Submissions - These reports include the
EM&A Manual, Habitat Creation Management Plan, Waste Management
Plans and minutes of the Environmental Committee meetings; |
| |
Air Monitoring Data – The results of dust measurements
taken at representative Air Sensitive Receivers (ASR) (for
example, residential premises, schools) along each of the
alignments during construction; |
| |
Noise Monitoring Data – The results of noise measurements
taken at representative Noise Sensitive Receivers (NSR) (for
example, residential premises, schools) during construction phase along each of the alignments and operational phase for Ma On Shan Rail; |
| |
Continuous Noise Monitoring Data – The results of continuous
noise measurements taken at representative NSRs along Middle
and Mody Roads, Tsim Sha Tsui during construction of the subway. |
| |
Cultural
Heritage Monitoring Data - Graphical display of the results
of geotechnical monitoring on and around the significant heritage
structures of Signal Hill. Monitoring includes Deformation
Monitoring Point (Types 2 and 4), Seismograph, In-place Tiltmeter
and Inclinometer; and |
| |
Water
Quality Monitoring Data - The results of water quality measurements
taken at locations representing the major water bodies along
the LMC alignment during construction. |